Clinical Trials Directory

Trials / Completed

CompletedNCT00803634

Clevidipine in the Treatment of Blood Pressure in Patients With Acute Heart Failure (PRONTO)

A Safety and Efficacy Study of Blood Pressure Control in Acute Heart Failure - A Pilot Study (PRONTO)

Status
Completed
Phase
Phase 3
Study type
Interventional
Enrollment
117 (actual)
Sponsor
The Medicines Company · Industry
Sex
All
Age
18 Years
Healthy volunteers
Not accepted

Summary

The purpose of this study was to evaluate the efficacy and safety of intravenous (IV) clevidipine as compared with standard of care IV antihypertensive agents for blood pressure (BP) lowering in patients with acute heart failure and elevated BP.

Detailed description

This study was an open-label randomized efficacy and safety pilot trial in patients with acute heart failure (AHF) and hypertension (systolic blood pressure \[SBP\] ≥160 mm Hg) requiring parenteral antihypertensive therapy. Eligible patients were randomized to receive clevidipine or standard of care (SOC) intravenous antihypertensive treatment in an open-label manner in a ratio of 1:1. At the time of randomization, a patient-specific, prespecified SBP target range was determined and be recorded, prior to study drug treatment. Information on the dosing regimen, use of additional or alternative agents and transition to oral therapy if needed is detailed in the study 'ARM' and 'INTERVENTION' sections. A Data Safety Monitoring Board was utilized periodically throughout the study to monitor the safety of patients. Adverse events were assessed for 7 days post-study randomization or hospital discharge, whichever occured first. Serious adverse events (SAEs) were assessed for 30 days following study randomization. Subjects were contacted by telephone or in person up to 5 days after their 30-day time point to determine if any SAEs occurred following study drug treatment and to follow up on the Heath Economic assessments.

Conditions

Interventions

TypeNameDescription
DRUGClevidipineClevidipine was to be administered continuously as monotherapy during the first 30 minutes. Use of an alternative IV antihypertensive agent(s) was discouraged and was limited to where medically necessary to maintain patient safety. Patients who received an alternative antihypertensive agent along with the study drug were allowed to continue in the study. If transition to an oral antihypertensive agent was required, it was to be administered approximately 1 hour prior to the termination of clevidipine with study drug down-titrated or terminated in order to maintain the desired blood pressure level.
DRUGStandard of Care IV antihypertensiveSOC IV antihypertensive agent will be administered for a minimum of 30 min and, if medically warranted, may continue beyond 96 hours at the investigator's discretion. As with clevidipine, the SOC agent was to be administered continuously as monotherapy during the first 30 minutes. Use of an alternative agent(s) was discouraged and was limited to where medically necessary to maintain patient safety. Higher dose titration rates were required to be attempted prior to making the decision to switch to or add on an alternative antihypertensive agent(s). Patients who received an alternative antihypertensive agent with SOC were allowed to continue in the study. If transition to an oral antihypertensive agent was required, it was to be administered per institutional practice.

Timeline

Start date
2008-12-01
Primary completion
2012-02-01
Completion
2012-03-01
First posted
2008-12-05
Last updated
2014-08-29
Results posted
2014-08-19

Locations

13 sites across 3 countries: United States, France, Germany

Source: ClinicalTrials.gov record NCT00803634. Inclusion in this directory is not an endorsement.