Clinical Trials Directory

Trials / Terminated

TerminatedNCT04740749

Longevity, Functional Status and Quality of Life of the Compress® Compliant Pre-Stress System

Longevity, Functional Status and Quality of Life of the Compress® Compliant Pre-Stress System: a Prospective Study

Status
Terminated
Phase
N/A
Study type
Interventional
Enrollment
200 (actual)
Sponsor
Universitaire Ziekenhuizen KU Leuven · Academic / Other
Sex
All
Age
7 Years
Healthy volunteers
Not accepted

Summary

In the treatment of malignant bone tumors, it may be necessary to remove large areas of the femur. To replace these large parts of missing bone, a prosthesis can be used. One innovative technology developed by Biomet is the Compress® Compliant Pre-Stress System (CPS; Zimmer-Biomet, Warsaw, USA). This fixation device uses compression, via a short traction bar, to stimulate osteointegration at the bone-prosthetic interface, promote hypertrophy of the loaded bone, and avoid stress bypass of the host bone around a stiff intramedullary stem. Young patients cured of tumors have a long life expectancy and a compelling need for prosthetic fixation that is equally durable. Good bone fixation is a prerequisite for implant longevity. Although the initial results are encouraging, there is a need for additional mid- to long-term survival data from larger patient series showing longevity of the system, as well as reporting of functional outcome. Furthermore, to the best of our knowledge, no study examining the survival of the device using prospective data already exists. In addition, no studies were found examining the quality of life of the patients with the CPS system.

Detailed description

In the treatment of malignant bone tumors, it may be necessary to remove large areas of the femur. To replace these large parts of missing bone, a prosthesis can be used. One innovative technology developed by Biomet is the Compress® Compliant Pre-Stress System (CPS; Zimmer-Biomet, Warsaw, USA). This fixation device uses compression, via a short traction bar, to stimulate osteointegration at the bone-prosthetic interface, promote hypertrophy of the loaded bone, and avoid stress bypass of the host bone around a stiff intramedullary stem. Young patients cured of tumors have a long life expectancy and a compelling need for prosthetic fixation that is equally durable. Good bone fixation is a prerequisite for implant longevity. Since 1999, the CPS has been routinely placed on the orthopedics - UZ Leuven service and, as a result, more than 100 patients have been treated in this way. However, there are only few studies reporting on long-term performance of this system. In addition, limited data reporting functional outcome were found. Although the initial results are encouraging, there is a need for additional mid- to long-term survival data from larger patient series showing longevity of the system, as well as reporting of functional outcome. Furthermore, to the best of our knowledge, no study examining the survival of the device using prospective data already exists. In addition, no studies were found examining the quality of life of the patients with the CPS system.

Conditions

Interventions

TypeNameDescription
DEVICECompress Compliant Pre-Stress SystemTreatment of malignant femor tumors with the Compress Compliant Pre-Stress System

Timeline

Start date
2021-09-01
Primary completion
2023-08-24
Completion
2023-08-24
First posted
2021-02-05
Last updated
2024-07-01

Locations

1 site across 1 country: Belgium

Source: ClinicalTrials.gov record NCT04740749. Inclusion in this directory is not an endorsement.