Clinical Trials Directory

Trials / Unknown

UnknownNCT02120053

Interest of Bone Substitute Material in Immediate Complete Denture

Interest of Bone Substitute Material in Immediate Complete Denture: a Controlled Randomized Clinical Trial

Status
Unknown
Phase
Phase 2 / Phase 3
Study type
Interventional
Enrollment
37 (actual)
Sponsor
Assistance Publique - Hôpitaux de Paris · Academic / Other
Sex
All
Age
18 Years
Healthy volunteers
Not accepted

Summary

More than 2 million French people suffer from the widespread disability of edentulism, with large consequences on function, nutrition, aesthetics and well-being. Complete denture is a common therapeutic strategy. The immediate complete denture technique consists in placing the denture in the same clinical session as last anterior teeth extractions. With this technique, aesthetic and function are immediately reintroduced and the patient is never left toothless or without any denture. After teeth extractions, alveolar healing process leads to ridge resorption with bone volume modifications and reduction in height and width. However ridge bone volume is an essential factor in removable denture stability. With implantology as an alternative prosthetic strategy, ridge volume is also a most important factor to place dental implants in a situation close to previous dental roots position. In order to preserve bone volume, a current alternative strategy proposes to place bone substitute materials in tooth sockets after extraction. This strategy was never evaluated with the immediate complete denture technique. Hypothesis: A new strategy associating immediate complete denture and bone substitute material is more effective than conventional immediate complete denture in a bone preservation perspective.

Conditions

Interventions

TypeNameDescription
DEVICEConventional protocolTeeth extractions and conventional immediate complete denture placement
DEVICEBone substitute material groupTeeth extractions and sockets filling with bone replacement material before immediate complete denture placement

Timeline

Start date
2013-10-01
Primary completion
2018-03-01
Completion
2018-03-01
First posted
2014-04-22
Last updated
2017-10-03

Locations

1 site across 1 country: France

Source: ClinicalTrials.gov record NCT02120053. Inclusion in this directory is not an endorsement.